Iran’s Bid Boland plant processes 3 bcm in six months

The Bid Boland gas plant in Iran processed over 3 billion cubic metres of gas in the six months up to 22 September this year.
By Staff reporter 29 September 2017 0 27781

The Bid Boland gas plant in Iran processed over 3 billion cubic metres of gas in the six months up to 22 September this year, up by 15% from the same period last year, according to the Shana news agency.

Gas is sent to the facility from the South Pars, Aghajari and Aghaz fields.

Talk to us
Natural Gas Daily welcomes your comments. Email us at comments@interfax.co.uk.