Tender open for the construction of Croatia’s LNG terminal

LNG Croatia has opened a tender for engineering and construction works for its planned FSRU off the island of Krk.
By Staff reporter 15 September 2017 0 27591

LNG Croatia has opened a tender for engineering and construction works for its planned FSRU off the island of Krk, the company said in a statement on Friday.

Works consist of the design and construction of a jetty, a connecting gas pipeline and high-pressure installations.

The deadline for submission of applications is 29 September.

LNG Croatia started seabed drilling and geological surveys in August.

The terminal will have a send-out capacity of 2 billion cubic metres per year and is expected to be commissioned in...

Log in or register for a free trial to continue reading this article

Already a subscriber?

If you already have a subscription, sign in to continue reading this article.

Sign in

Not a subscriber?

To access our premium content, you or your organisation must have a paid subscription. Sign up for free trial access to demo this service. Alternatively, please call +44 (0)20 3004 6203 and one of our representatives would be happy to walk you through the service.

Sign up