FERC processing 51 pipeline project applications

The United States Federal Energy Regulatory Commission was processing 51 applications for pipeline projects as of the end of August.
By Staff reporter 4 September 2017 0 27440

The United States Federal Energy Regulatory Commission (FERC) was processing 51 applications for pipeline projects as of the end of August, while 10 pre-filing applications have been submitted, according to data from PointLogic Energy, the Energy Information Administration (EIA) has reported.

“The combined proposed capacity of all these projects totals about [1.27 billion cubic metres per day], covering over [4,800 km] of both new and upgraded pipeline construction,” the EIA said.

The 10 largest projects by capacity that have applied to FERC have a...

Log in or register for a free trial to continue reading this article

Already a subscriber?

If you already have a subscription, sign in to continue reading this article.

Sign in

Not a subscriber?

To access our premium content, you or your organisation must have a paid subscription. Sign up for free trial access to demo this service. Alternatively, please call +44 (0)20 3004 6203 and one of our representatives would be happy to walk you through the service.

Sign up