Fourth Shaanxi-Beijing pipeline will be online by October

By Staff reporter 4 August 2017
  • Twitter logo
  • LinkedIn logo
  • facebook logo
  • Email logo

The fourth Shaanxi-Beijing gas pipeline will be operational by the end of October, according to local media.

The pipeline, which has a designed capacity of 25 billion cubic metres per year, is now 80% complete.

The line is expected to transport 5 bcm of gas this year, while all four lines are expected to supply a combined 28.5 bcm in 2017.

Talk to us
Natural Gas Daily welcomes your comments. Email us at comments@interfax.co.uk.