Exploration & Production

Sinopec flows 191.5 Mcm from Fuling shale well

Sinopec has flowed 191,500 cubic metres from the Jiaoye 90-2HF well in the Fuling shale gas field.
By Staff reporter 19 April 2017 0 25549

Sinopec has flowed 191,500 cubic metres from the Jiaoye 90-2HF well in the Fuling shale gas field, the company has said.

The well is located in the Jiangdong Block.