Sinopec flows 191.5 Mcm from Fuling shale well

By Staff reporter 19 April 2017
  • Twitter logo
  • LinkedIn logo
  • facebook logo
  • Email logo

Sinopec has flowed 191,500 cubic metres from the Jiaoye 90-2HF well in the Fuling shale gas field.

Log in or register for a free trial to continue reading this article

Already a subscriber?

If you already have a subscription, sign in to continue reading this article.

Sign in

Not a subscriber?

To access our premium content, you or your organisation must have a paid subscription. Sign up for free trial access to demo this service. Alternatively, please call +44 (0)20 3004 6203 and one of our representatives would be happy to walk you through the service.

Sign up