Sinopec flows 191.5 Mcm from Fuling shale well

Sinopec has flowed 191,500 cubic metres from the Jiaoye 90-2HF well in the Fuling shale gas field.
By Staff reporter 19 April 2017 0 25549

Sinopec has flowed 191,500 cubic metres from the Jiaoye 90-2HF well in the Fuling shale gas field, the company has said.

The well is located in the Jiangdong Block.

Talk to us
Natural Gas Daily welcomes your comments. Email us at comments@interfax.co.uk.