Libya’s NOC lifts force majeure at Wafa field

Libya’s NOC has lifted the force majeure on production from the Wafa field in the west of the country.
By Staff reporter 13 April 2017 0 25490

Libya’s NOC has lifted the force majeure on production from the Wafa field in the west of the country.

The pipeline serving the field was reopened on Wednesday. An armed group shut down the oil and gas pumping stations at the Wafa field on 26 March, NOC said in a statement on Monday.

The action resulted in massive lost earnings, according to the company. "The Libyan Al Wafa Field and the Algerian Al Rar Field have a reservoir connectivity and shutting down any of them will affect...

Log in or register for a free trial to continue reading this article

Already a subscriber?

If you already have a subscription, sign in to continue reading this article.

Sign in

Not a subscriber?

To access our premium content, you or your organisation must have a paid subscription. Sign up for free trial access to demo this service. Alternatively, please call +44 (0)20 3004 6203 and one of our representatives would be happy to walk you through the service.

Sign up